Krav på jordprovtagning i Kalifornien
Statliga regler: Central Valley Regional Water Quality Control Board Order R5-2013-0122, Återutfärdad allmän förordning om avloppsutsläpp för befintliga mjölkkomejerier. Statliga riktlinjer: University of California Cooperative Extension, riktlinjer för jordprovtagning.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| CaliforniaUnited StatesCalifornia, Central Valley Region only: existing milk cow dairies under Order R5-2013-0122. Other regions and states set their own rules. | Soil phosphorus monitoring on dairy land application areasCentral Valley Water Board, Dairy General Order (waste discharge requirements for existing milk cow dairies) |
| Not specified | Not specified | Not specified | Not specified | ConditionalCentral Valley Water Board Order R5-2013-0122 with Monitoring and Reporting Program (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Who it applies to
Laboratory and analysis
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| CaliforniaUnited StatesCalifornia only. Other states set their own rules. | General fertility and nitrate samplingUniversity of California Cooperative Extension, guidelines for soil sampling |
| Not specified | W-shaped pattern, a zigzag across the whole block, or a diagonal line. Divide non-uniform fields into blocks by cropping history and varieties, observed differences in crop development, and soil series. | General fertility: 6 inches or tilling depth. Nitrate-N: 6 inches to 3 feet, by rooting depth and leaching risk. | At least 20 cores per block | Official guidanceUCCE, Guidelines for Soil Sampling (PDF, UC ANR) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Method
Depth
Cores
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
USA: federala regler och alla andra delstater
Jordprovtagningsregler i alla länder
Rapportera ett föråldrat krav: info@geopard.tech
Ställ in arean per prov, kärnorna och det djup som din regel begär. GeoPard placerar punkterna i ett rutnät eller per zon, ruter promenaden, skriver ut etiketterna och tar med sig planen till fältet på en telefon.
En planeringsreferens byggd på officiella källor, inte juridisk rådgivning. Regler gäller beroende på jurisdiktion, näringsämne, markanvändning och program: kontrollera den aktuella officiella texten och ditt laboratoriums instruktioner före fältarbete.