Pinnase proovivõtu nõuded Californias
Osariigi eeskirjad: Central Valley piirkondliku veekvaliteedi kontrolli nõukogu korraldus R5-2013-0122, uuesti välja antud jäätmekäitluse nõuete üldmäärus olemasolevatele piimafarmidele. Osariigi juhised: California Ülikooli ühistu laiendusteenistus, mullaproovide võtmise juhised.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| CaliforniaUnited StatesCalifornia, Central Valley Region only: existing milk cow dairies under Order R5-2013-0122. Other regions and states set their own rules. | Soil phosphorus monitoring on dairy land application areasCentral Valley Water Board, Dairy General Order (waste discharge requirements for existing milk cow dairies) |
| Not specified | Not specified | Not specified | Not specified | ConditionalCentral Valley Water Board Order R5-2013-0122 with Monitoring and Reporting Program (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Who it applies to
Laboratory and analysis
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| CaliforniaUnited StatesCalifornia only. Other states set their own rules. | General fertility and nitrate samplingUniversity of California Cooperative Extension, guidelines for soil sampling |
| Not specified | W-shaped pattern, a zigzag across the whole block, or a diagonal line. Divide non-uniform fields into blocks by cropping history and varieties, observed differences in crop development, and soil series. | General fertility: 6 inches or tilling depth. Nitrate-N: 6 inches to 3 feet, by rooting depth and leaching risk. | At least 20 cores per block | Official guidanceUCCE, Guidelines for Soil Sampling (PDF, UC ANR) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Method
Depth
Cores
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
Ameerika Ühendriigid: föderaalsed reeglid ja kõik teised osariigid
Pinnase proovivõtu eeskirjad igas riigis
Teata aegunud nõudest: info@geopard.tech
Määrake proovi pindala, südamikud ja sügavus, mida teie reegel nõuab. GeoPard paigutab punktid ruudustikule või tsoonide kaupa, marsruudib jalutuskäigu, prindib sildid ja võtab plaani telefoni teel põllule kaasa.
Planeerimisjuhend, mis põhineb ametlikel allikatel, mitte juriidilisel nõuandel. Reeglid kehtivad jurisdiktsiooni, toitainete, maakasutuse ja programmi lõikes: enne välitööde alustamist kontrollige kehtivat ametlikku teksti ja oma labori juhiseid.