インディアナ州における土壌サンプリングの要件
州のガイダンス:IDEMによる、畜舎飼育施設(CFO)規則、327 IAC 19、糞尿管理計画、およびパデュー大学エクステンションの土壌サンプリングガイドラインに関するガイダンス。.
IDEM guidance on the Confined Feeding Operation (CFO) rule, 327 IAC 19, manure management plan: 均一な100エーカーの圃場を採取するには、それぞれ20エーカー以下の複合サンプルを少なくとも5つ、合計で少なくとも60個のコアサンプル(1サンプルあたり12個)が必要です。.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| IndianaUnited StatesIndiana only. Other states set their own rules. | Soil phosphorus test for manure application ratesIDEM guidance on the Confined Feeding Operation (CFO) rule, 327 IAC 19, manure management plan |
| IDEM: each soil test may represent no more than 20 acres (8.0937 ha) | IDEM: composite samples, or averaged results, within areas of up to 20 acres, with the procedure set out in the manure management plan. Grid sampling is good practice, not required. | Not specified | IDEM: 12 to 15 plugs recommended for a composite from a 20 acre area | Official guidanceIDEM, Guidance Manual for Indiana’s Confined Feeding Program (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Cores
Who it applies to
Laboratory and analysis
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| IndianaUnited StatesIndiana only. Other states set their own rules. | Routine soil fertility samplingPurdue Extension soil sampling guidelines |
| Whole field: at least one composite per 20 acres. Grid cells 1 to 5 acres, 2.5 acres or less works best. Zones usually 2 to 10 acres. | Zig-zag pattern for whole-field sampling. Grid or zone sampling for variable-rate maps; zone sampling preferred over grid. | Conventional tillage: 0 to 8 inches. Conservation tillage: separate 0 to 4 inch sample for pH and lime, 0 to 8 inches for fertility. | 10 to 20 subsamples per composite. Zones: two per acre, at least five. Grids: at least five for a 1 acre cell, 8 to 10 for 2.5 to 5 acre cells. | Official guidancePurdue Extension AY-368-W, Soil Sampling Guidelines (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Depth
Cores
Laboratory and analysis
Field identifiers
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
古い要件を報告する: info@geopard.tech
サンプルごとの面積、コア数、およびルールで指定する深さを設定します。GeoPardは、グリッドまたはゾーンごとにポイントを配置し、歩行ルートを決定し、ラベルを印刷し、作成したプランをスマートフォンに転送して現場に提供します。.
これは公式資料に基づいた計画策定の参考資料であり、法的助言ではありません。規則は管轄区域、栄養素、土地利用、プログラムによって異なります。現地調査を行う前に、最新の公式文書と研究室の指示書を確認してください。.