متطلبات أخذ عينات التربة في ولاية إنديانا
إرشادات الولاية: إرشادات إدارة البيئة في ولاية إنديانا بشأن قاعدة عمليات التغذية المحصورة (CFO)، 327 IAC 19، وخطة إدارة السماد وإرشادات أخذ عينات التربة من جامعة بوردو.
IDEM guidance on the Confined Feeding Operation (CFO) rule, 327 IAC 19, manure management plan: يحتاج حقل موحد بمساحة 100 فدان إلى 5 عينات مركبة على الأقل لا تزيد مساحة كل منها عن 20 فدانًا، و60 عينة أساسية على الأقل في المجموع، 12 عينة لكل عينة.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| IndianaUnited StatesIndiana only. Other states set their own rules. | Soil phosphorus test for manure application ratesIDEM guidance on the Confined Feeding Operation (CFO) rule, 327 IAC 19, manure management plan |
| IDEM: each soil test may represent no more than 20 acres (8.0937 ha) | IDEM: composite samples, or averaged results, within areas of up to 20 acres, with the procedure set out in the manure management plan. Grid sampling is good practice, not required. | Not specified | IDEM: 12 to 15 plugs recommended for a composite from a 20 acre area | Official guidanceIDEM, Guidance Manual for Indiana’s Confined Feeding Program (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Cores
Who it applies to
Laboratory and analysis
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| IndianaUnited StatesIndiana only. Other states set their own rules. | Routine soil fertility samplingPurdue Extension soil sampling guidelines |
| Whole field: at least one composite per 20 acres. Grid cells 1 to 5 acres, 2.5 acres or less works best. Zones usually 2 to 10 acres. | Zig-zag pattern for whole-field sampling. Grid or zone sampling for variable-rate maps; zone sampling preferred over grid. | Conventional tillage: 0 to 8 inches. Conservation tillage: separate 0 to 4 inch sample for pH and lime, 0 to 8 inches for fertility. | 10 to 20 subsamples per composite. Zones: two per acre, at least five. Grids: at least five for a 1 acre cell, 8 to 10 for 2.5 to 5 acre cells. | Official guidancePurdue Extension AY-368-W, Soil Sampling Guidelines (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Depth
Cores
Laboratory and analysis
Field identifiers
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
الولايات المتحدة: القواعد الفيدرالية وكل ولاية أخرى
لوائح أخذ عينات التربة في كل دولة
الإبلاغ عن متطلبات قديمة: info@geopard.tech
حدد المساحة لكل عينة، وعدد العينات الأساسية، والعمق المطلوب وفقًا لقاعدتك. يقوم برنامج GeoPard بوضع النقاط على شبكة أو حسب المنطقة، ويحدد مسار المشي، ويطبع التسميات، وينقل الخطة إلى الموقع عبر الهاتف.
مرجع تخطيطي مستمد من مصادر رسمية، وليس استشارة قانونية. تُطبق القواعد حسب الاختصاص القضائي، ونوع المغذيات، واستخدام الأراضي، والبرنامج: يُرجى مراجعة النص الرسمي الحالي وتعليمات المختبر قبل بدء العمل الميداني.