Pinnase proovivõtu nõuded Indianas
Riiklikud juhised: IDEM-i juhised piiratud söötmise (CFO) eeskirja kohta, 327 IAC 19, sõnniku käitlemiskava ja Purdue Extensioni mullaproovide võtmise juhised.
IDEM guidance on the Confined Feeding Operation (CFO) rule, 327 IAC 19, manure management plan: Ühtlase 100-aakrise põllu jaoks on vaja vähemalt viit mitte rohkem kui 20 aakri suurust liitproovi ja kokku vähemalt 60 südamikku, 12 proovi kohta.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| IndianaUnited StatesIndiana only. Other states set their own rules. | Soil phosphorus test for manure application ratesIDEM guidance on the Confined Feeding Operation (CFO) rule, 327 IAC 19, manure management plan |
| IDEM: each soil test may represent no more than 20 acres (8.0937 ha) | IDEM: composite samples, or averaged results, within areas of up to 20 acres, with the procedure set out in the manure management plan. Grid sampling is good practice, not required. | Not specified | IDEM: 12 to 15 plugs recommended for a composite from a 20 acre area | Official guidanceIDEM, Guidance Manual for Indiana’s Confined Feeding Program (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Cores
Who it applies to
Laboratory and analysis
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| IndianaUnited StatesIndiana only. Other states set their own rules. | Routine soil fertility samplingPurdue Extension soil sampling guidelines |
| Whole field: at least one composite per 20 acres. Grid cells 1 to 5 acres, 2.5 acres or less works best. Zones usually 2 to 10 acres. | Zig-zag pattern for whole-field sampling. Grid or zone sampling for variable-rate maps; zone sampling preferred over grid. | Conventional tillage: 0 to 8 inches. Conservation tillage: separate 0 to 4 inch sample for pH and lime, 0 to 8 inches for fertility. | 10 to 20 subsamples per composite. Zones: two per acre, at least five. Grids: at least five for a 1 acre cell, 8 to 10 for 2.5 to 5 acre cells. | Official guidancePurdue Extension AY-368-W, Soil Sampling Guidelines (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Depth
Cores
Laboratory and analysis
Field identifiers
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
Ameerika Ühendriigid: föderaalsed reeglid ja kõik teised osariigid
Pinnase proovivõtu eeskirjad igas riigis
Teata aegunud nõudest: info@geopard.tech
Määrake proovi pindala, südamikud ja sügavus, mida teie reegel nõuab. GeoPard paigutab punktid ruudustikule või tsoonide kaupa, marsruudib jalutuskäigu, prindib sildid ja võtab plaani telefoni teel põllule kaasa.
Planeerimisjuhend, mis põhineb ametlikel allikatel, mitte juriidilisel nõuandel. Reeglid kehtivad jurisdiktsiooni, toitainete, maakasutuse ja programmi lõikes: enne välitööde alustamist kontrollige kehtivat ametlikku teksti ja oma labori juhiseid.