Pinnase proovivõtu nõuded Alabamas
Osariigi eeskirjad: Alabama halduskoodeks, peatükk 335-6-7 (ADEM, loomade söötmisega seotud toimingud). Osariigi juhised: Alabama ühistu laiendussüsteem, täpsed mullaproovide võtmise nõuanded.
Alabama Cooperative Extension System, precision soil sampling advice: Ühtlane 100-aakrine põld vajab vähemalt 40 kuni 2,5 aakri suurust liitproovi ja kokku vähemalt 320 südamikku, 8 proovi kohta.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| AlabamaUnited StatesAlabama only. Other states set their own rules. | Soil tests on fields that receive animal wasteADEM animal feeding operation rules (AFO and CAFO) |
| Not specified | Accepted standard soil sampling procedures, on each field. | 0 to 3 inches in sod crops. Depth of the plow layer in cultivated crops. | Not specified | ConditionalAla. Admin. Code ch. 335-6-7 (Alabama Legislative Services Agency) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Method
Depth
Who it applies to
Laboratory and analysis
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| AlabamaUnited StatesAlabama only. Other states set their own rules. | Grid and zone sampling for lime and fertilizerAlabama Cooperative Extension System, precision soil sampling advice |
| Grids of 2.5 acres or less. Up to 5 acres in relatively uniform fields. Zones of 10 acres or less. | Grid sampling to set a baseline in new or problem fields, then management zones. Hand sampling: cores in a circle around the grid center. Automated samplers: an S pattern through the grid. A zigzag through each zone. | Not specified | Eight to twelve cores per grid or zone sample. At least ten to fifteen for zones of 10 acres or less, more for larger zones. | Official guidanceACES ANR-3181, Precision Soil Sampling Strategies for Site-Specific Nutrient Management |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Cores
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
Ameerika Ühendriigid: föderaalsed reeglid ja kõik teised osariigid
Pinnase proovivõtu eeskirjad igas riigis
Teata aegunud nõudest: info@geopard.tech
Määrake proovi pindala, südamikud ja sügavus, mida teie reegel nõuab. GeoPard paigutab punktid ruudustikule või tsoonide kaupa, marsruudib jalutuskäigu, prindib sildid ja võtab plaani telefoni teel põllule kaasa.
Planeerimisjuhend, mis põhineb ametlikel allikatel, mitte juriidilisel nõuandel. Reeglid kehtivad jurisdiktsiooni, toitainete, maakasutuse ja programmi lõikes: enne välitööde alustamist kontrollige kehtivat ametlikku teksti ja oma labori juhiseid.