Wymagania dotyczące pobierania próbek gleby w stanie Iowa
Przepisy stanowe: Kodeks Administracyjny stanu Iowa 567, Rozdział 65 (Działalność związana z karmieniem zwierząt). Wytyczne stanowe: Porady dotyczące pobierania próbek gleby w ramach Iowa State University Extension and Outreach.
Iowa DNR manure management plans (MMP) for confinement feeding operations: Jednorodne pole o powierzchni 100 akrów wymaga co najmniej 10 próbek kompozytowych, z których każda nie zajmuje więcej niż 10 akrów, oraz co najmniej 100 rdzeni, po 10 na próbkę.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| IowaUnited StatesIowa only. Other states set their own rules. | Soil phosphorus and pH tests for the phosphorus indexIowa DNR manure management plans (MMP) for confinement feeding operations |
| No more than 10 acres per sample. One sample for a field of 15 acres or less. Up to 20 acres for the next sampling where manure went on at phosphorus-based rates. | Grid, management zone or soil type sampling, among others. Procedural details may be taken from ISU Extension CROP 31-8 (published as CROP 3108), NCR-13 Report 348 or other credible soil sampling publications. | 0 to 6 inches | At least 10 cores per composite sample | ConditionalIowa Administrative Code 567, Chapter 65 (PDF, IAC 8/6/25) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Depth
Cores
Who it applies to
Outside the rule
Laboratory and analysis
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| IowaUnited StatesIowa only. Other states set their own rules. | Routine soil fertility samplingIowa State University Extension and Outreach soil sampling advice |
| Grid: a suggested minimum of one sample per 2.5 acres. Beyond that, zone sampling is likely more effective. Otherwise one sample per uniform area. | Soil map unit or management zone sampling, or grid sampling. Cores in a random zigzag pattern across each area; grid points cover an area at least 50 feet across. | P, K, Zn and organic matter: 0 to 6 inches in all tillage systems. pH: 0 to 6 inches with tillage, top 2 to 3 inches in no-till and in hay or pasture. | At least 10 to 12 cores per sample. 15 to 20 for a better average. At least 20 with recent banded fertilizer or manure. | Official guidanceISU Extension and Outreach CROP 3108 (PDF, copy hosted by Iowa DNR) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Depth
Cores
Laboratory and analysis
Field identifiers
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
Stany Zjednoczone: przepisy federalne i wszystkie inne przepisy stanowe
Przepisy dotyczące pobierania próbek gleby w każdym kraju
Zgłoś nieaktualne wymaganie: info@geopard.tech
Ustaw obszar na próbkę, rdzenie i głębokość, o którą prosi Twoja reguła. GeoPard rozmieszcza punkty na siatce lub według strefy, wyznacza trasę przejścia, drukuje etykiety i przesyła plan w teren na telefonie.
Odniesienie do planowania oparte na oficjalnych źródłach, a nie na poradach prawnych. Zasady obowiązują w zależności od jurysdykcji, składników odżywczych, użytkowania gruntów i programu: przed rozpoczęciem prac terenowych należy sprawdzić aktualny tekst urzędowy i instrukcje laboratoryjne.