Anforderungen an die Bodenprobenahme in Maryland
Landesvorschriften: COMAR 15.20.08, Nährstoffmanagementvorschriften, und COMAR 15.20.07. Landeshinweise: Empfehlungen zur Bodenprobenahme der University of Maryland Extension.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| MarylandUnited StatesMaryland only. Other states set their own rules. | Soil analysis results in a nutrient management planMaryland Nutrient Management Program (Maryland Department of Agriculture) |
| Not specified | Standard soil sampling methods acceptable to the Department, per field or management unit. Documented variations: larger uniform fields or a crop rotation as one unit, combined strip-cropped fields, smaller units for specialized production. | Not specified | Not specified | ConditionalCOMAR 15.20.08.05, Required Plan Recommendations |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Method
Who it applies to
Outside the rule
Laboratory and analysis
Sources
Sources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| MarylandUnited StatesMaryland only. Other states set their own rules. | Routine soil fertility samplingUniversity of Maryland Extension soil sampling advice |
| Not specified | Sample each management unit separately, cores at random across the unit. Grid or zone sampling where it fits the farm. | Fertility, cropland and pasture: 0 to 8 inches. Pasture and continuous no-till: a second 0 to 2 inch sample for pH only. | At least 15 to 20 cores for units of about 20 acres or less. At least one per acre for 20 to 30 acres. Less than one per acre is acceptable above 40 acres. | Official guidanceUniversity of Maryland Extension FS-1184 (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Method
Depth
Cores
Laboratory and analysis
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
Vereinigte Staaten: Bundesregeln und alle anderen staatlichen Regeln
Vorschriften zur Bodenprobenahme in jedem Land
Melden Sie eine veraltete Anforderung: info@geopard.tech
Legen Sie die Fläche pro Probe, die Anzahl der Bohrkerne und die von Ihrer Regel geforderte Tiefe fest. GeoPard platziert die Punkte in einem Raster oder nach Zonen, plant die Begehung, druckt die Beschriftungen und stellt den Plan auf einem Smartphone für das Gelände bereit.
Diese Planungshilfe basiert auf offiziellen Quellen und stellt keine Rechtsberatung dar. Die Regeln richten sich nach Zuständigkeit, Nährstoffart, Landnutzung und Programm: Bitte prüfen Sie vor Feldarbeiten den aktuellen offiziellen Text und die Anweisungen Ihres Labors.