Anforderungen an die Bodenprobenahme in Florida
Landesvorschriften: FDACS Florida Vegetable and Agronomic Crop Operations BMP Manual, Ausgabe 2024 (FDACS-P-01268, Rev. 12/24), enthalten in Regel 5M-8.002, FAC. Landeshinweise: UF/IFAS Extension Soil Testing Laboratory, Hinweise zur Probenahme.
UF/IFAS Extension Soil Testing Laboratory, sampling advice: Für ein gleichmäßiges 100 Hektar großes Feld werden mindestens 3 Mischproben von jeweils höchstens 40 Hektar benötigt, insgesamt mindestens 24 Bohrkerne, 8 pro Probe.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| FloridaUnited StatesFlorida only. Other states set their own rules. | Soil or tissue tests to plan fertilizer on enrolled vegetable and agronomic crop landFDACS agricultural Best Management Practices, Florida Vegetable and Agronomic Crop (VAC) Operations |
| Not specified | Not specified | Not specified | Not specified | ConditionalFDACS VAC BMP Manual, 2024 Edition (PDF), incorporated in Rule 5M-8.002, F.A.C. |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Who it applies to
Outside the rule
Laboratory and analysis
In force
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| FloridaUnited StatesFlorida only. Other states set their own rules. | Routine soil fertility samplingUF/IFAS Extension Soil Testing Laboratory, sampling advice |
| Up to 40 acres of a field section in commercial agriculture, uniform in management and topography | One composite per area uniform in management and topography. Separate samples for areas that differ. | Top 6 inches for most agronomic uses | 8 to 15 locations per composite sample | Official guidanceUF/IFAS Extension SL547/SS763 |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Depth
Cores
Laboratory and analysis
Sources
Sources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
Vereinigte Staaten: Bundesregeln und alle anderen staatlichen Regeln
Vorschriften zur Bodenprobenahme in jedem Land
Melden Sie eine veraltete Anforderung: info@geopard.tech
Legen Sie die Fläche pro Probe, die Anzahl der Bohrkerne und die von Ihrer Regel geforderte Tiefe fest. GeoPard platziert die Punkte in einem Raster oder nach Zonen, plant die Begehung, druckt die Beschriftungen und stellt den Plan auf einem Smartphone für das Gelände bereit.
Diese Planungshilfe basiert auf offiziellen Quellen und stellt keine Rechtsberatung dar. Die Regeln richten sich nach Zuständigkeit, Nährstoffart, Landnutzung und Programm: Bitte prüfen Sie vor Feldarbeiten den aktuellen offiziellen Text und die Anweisungen Ihres Labors.