Anforderungen an die Bodenprobenahme in Polen

Anforderungen an die Bodenprobenahme in Polen

Nationale Vorschriften: Rozporządzenie Ministra Rolnictwa i Rozwoju Wsi z dnia 13 marca 2023 r. (Dz. U. 2023 Pos. 493), in der geänderten Fassung bis Dz. U. 2026 poz. 325. Nationale Leitlinien: Probenahmeanweisung für chemisch-landwirtschaftliche Stationen (SChR A 1).

Soil sampling rules in Poland, with the exact wording of each source
Country / region Purpose / programme Time / frequency Area per sample Method Depth Cores Status and source
Poland
PolandChemical soil analysis behind the fertilisation planCAP eco-scheme Carbon farming and nutrient management (Rolnictwo węglowe i zarządzanie składnikami odżywczymi), practice Fertilisation plan (Opracowanie i przestrzeganie planu nawożenia)Not specifiedNot specifiedSoil samples taken under the standard on sampling for agrochemical soil testing, from each agricultural parcel on arable land and permanent grassland.Not specifiedNot specifiedConditionalDz. U. 2023 poz. 493, text as published (Sejm ELI)
Who it applies to, the exact wording and every source
Who it applies to
Farmers claiming eco-scheme points for the fertilisation plan practice, basic variant or variant with liming, on arable land and permanent grassland. The plan must exist within 25 days of the payment application deadline (30 September for winter crops sown that year). The liming variant needs soil pH of 5.5 or less in the chemical soil analysis.
Outside the rule
From 2026, peatland and wetland covered by GAEC 2 is not counted in the parcel area for the liming variant.
Laboratory and analysis
A laboratory that carries out agrochemical soil testing. The plan rests on a nitrogen balance and a chemical soil analysis.
In force from
Under review
Legal text
Rozporządzenie Ministra Rolnictwa i Rozwoju Wsi z dnia 13 marca 2023 r. (Dz. U. 2023 poz. 493), as amended up to Dz. U. 2026 poz. 325, § 4 ust. 1 pkt 3 and § 7 ust. 2 to 4

The wording in the source

Method

  • oparciu o próbki gleby pobrane zgodnie z normą w zakresie pobierania próbek do badań agrochemicznych gleby z poszczególnych działek rolnych położonych na gruntach ornych i trwałych użytkach zielonych.

    on the basis of soil samples taken in accordance with the standard on sampling for agrochemical soil testing, from the individual agricultural parcels on arable land and permanent grassland.

    § 7 ust. 4 pkt 2

Who it applies to

  • Opracowanie i przestrzeganie planu nawożenia: a) w wariancie podstawowym lub b) w wariancie z wapnowaniem;

    Drawing up and following a fertilisation plan: a) in the basic variant or b) in the variant with liming;

    § 4 ust. 1 pkt 3

  • Punkty, o których mowa w ust. 1, są przyznawane, jeżeli rolnik posiada plan nawozowy opracowany do powierzchni gruntów, o których mowa w ust. 1, w terminie: 1) 25 dni od dnia, w którym upływa termin składania wniosków o przyznanie płatności, albo 2) do dnia 30 września roku, w którym został złożony wniosek o przyznanie płatności – w przypadku upraw ozimych wysiewanych w roku złożenia tego wniosku.

    The points referred to in para. 1 are granted if the farmer holds a fertilisation plan drawn up for the area of land referred to in para. 1 within: 1) 25 days of the day on which the deadline for payment applications expires, or 2) by 30 September of the year in which the payment application was submitted, for winter crops sown in the year of that application.

    § 7 ust. 2

  • zastosował wapnowanie na powierzchni gruntów w gospodarstwie o pH niższym lub równym 5,5 określonym w wynikach chemicznej analizy gleby;

    applied liming on land of the holding with a pH lower than or equal to 5.5 as determined in the results of the chemical soil analysis;

    § 7 ust. 3 pkt 3 (variant with liming)

Outside the rule

  • Powierzchnia działki rolnej, o której mowa w ust. 3, nie obejmuje torfowisk i obszarów podmokłych objętych normą GAEC 2, o której mowa w załączniku III do rozporządzenia 2021/2115

    The area of the agricultural parcel referred to in para. 3 does not include peatland and wetland covered by the GAEC 2 standard referred to in Annex III to Regulation 2021/2115

    § 7 ust. 3a, added by Dz. U. 2026 poz. 325, § 1 pkt 1

Laboratory and analysis

  • Plan nawozowy, o którym mowa w ust. 2, sporządza się w oparciu o bilans azotu i chemiczną analizę gleby wykonywaną w: 1) laboratorium wykonującym badania agrochemiczne gleb;

    The fertilisation plan referred to in para. 2 is drawn up on the basis of a nitrogen balance and a chemical soil analysis carried out: 1) in a laboratory that carries out agrochemical soil testing;

    § 7 ust. 4 pkt 1

Sources

Sources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team.

PolandSoil sampling for agrochemical analysisChemical-agricultural station sampling instruction (SChR A 1)
  • Season Spring or autumn, before fertiliser is spread
  • Wait Avoid sampling straight after mineral or organic fertiliser, and in excessive drought or wet soil
One composite sample for at most 4 ha of uniform soil and similar terrain, separately for each cropUp to 20 primary samples along a set scheme, preferably at right angles to cultivation and fertilising passes. Not within 5 m of the field edge, on former stack or heap sites, in ditches, furrows, molehills or gravel patches, or in hollows and steep rises.0 to 20 cmNot specifiedOfficial guidanceKrajowa Stacja Chemiczno-Rolnicza, Instrukcje (attachment SChR A 1, .doc)
Who it applies to, the exact wording and every source
Who it applies to
Sampling instruction from the national network of chemical-agricultural stations for arable land and grassland samples sent to a station. Not law.
Field identifiers
Number each sample on a field sketch with the area it represents; mark grassland samples with X.
In force from
Under review
Legal text
Krajowa Stacja Chemiczno-Rolnicza, Instrukcja pobierania próbek glebowych (SChR A 1), based on PN-R-04031:1997

The wording in the source

Timing

  • Najodpowiedniejszym okresem pobierania próbek glebowych jest okres wiosenny lub jesienny przed wysiewem nawozów.

    The most suitable time for soil sampling is spring or autumn, before fertiliser is spread.

    SChR A 1, point 11

  • Należy unikać pobierania próbek bezpośrednio po zastosowaniu nawozów mineralnych, po nawożeniu organicznym oraz w okresie nadmiernej suszy lub wilgotnej gleby.

    Avoid sampling directly after mineral fertiliser, after organic fertilising, and in periods of excessive drought or wet soil.

    SChR A 1, point 12

Area per sample

  • Powierzchnia użytku przypadająca na próbkę ogólną, przy wyrównanej pod względem glebowym powierzchni i zbliżonym ukształtowaniem terenu, nie może przekroczyć obszaru 4ha.

    The area of land per composite sample, on soil-uniform land with similar terrain, may not exceed 4 ha.

    SChR A 1, point on area per composite sample

  • Próbkę ogólną należy przygotować oddzielnie dla każdej uprawy.

    Prepare a separate composite sample for each crop.

    SChR A 1

Method

  • Aby sporządzić próbkę ogólną należy pobrać do 20 próbek pierwotnych według schematu

    To make up a composite sample, take up to 20 primary samples following the scheme

    SChR A 1, sampling scheme

  • zaleca się prostopadły kierunek pobierania do zabiegów agrotechnicznych (uprawa, nawożenie)

    sampling at right angles to field operations (cultivation, fertilising) is recommended

    SChR A 1, under the scheme

  • Próbek nie należy pobierać: na obrzeżach pola do 5m … w miejscach po stogach i kopcach … w rowach, bruzdach, kretowiskach i żwirowiskach … w zagłębieniach i ostrych wzniesieniach terenu

    Do not take samples: at the field edges up to 5 m … on former stack and heap sites … in ditches, furrows, molehills and gravel patches … in hollows and steep rises

    SChR A 1, point 10 (do not sample)

Depth

  • Próbki pierwotne pobiera się laską glebową z wierzchniej warstwy gleby 0-20cm

    Primary samples are taken with a soil probe from the top soil layer 0 to 20 cm

    SChR A 1, point 9

Field identifiers

  • Próbki ogólne powinny być zaznaczone na dokładnie wykonanym szkicu, opatrzone kolejnymi numerami wraz z określeniem powierzchni pola, którą reprezentują. Próbki pobrane z użytków zielonych muszą być oprócz numeru oznakowane X.

    Composite samples should be marked on an accurate sketch, numbered in sequence with the field area they represent. Samples from grassland must be marked X as well as numbered.

    SChR A 1

Sources

Sources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team.

Vorschriften zur Bodenprobenahme in jedem Land

Melden Sie eine veraltete Anforderung: info@geopard.tech

Planen Sie die Punkte gemäß der geltenden Regel.

Legen Sie die Fläche pro Probe, die Anzahl der Bohrkerne und die von Ihrer Regel geforderte Tiefe fest. GeoPard platziert die Punkte in einem Raster oder nach Zonen, plant die Begehung, druckt die Beschriftungen und stellt den Plan auf einem Smartphone für das Gelände bereit.

wpChatIcon
wpChatIcon

    Kostenlose GeoPard Demo / Beratung anfordern








    Mit Klick auf den Button stimmen Sie unseren Datenschutzbestimmungen. Wir brauchen es für die Beantwortung Ihrer Anfrage.

      Abonnieren


      Mit Klick auf den Button stimmen Sie unseren Datenschutzbestimmungen

        Schicken Sie uns Informationen


        Mit Klick auf den Button stimmen Sie unseren Datenschutzbestimmungen