Soil sampling requirements in Wisconsin
State guidance: UW Extension A2100, Sampling Soils for Testing.
UW Extension A2100, Sampling Soils for Testing: A uniform 100-acre field needs at least 20 composite samples of no more than 5 acres each, and at least 200 cores in all, 10 per sample.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| WisconsinUnited StatesWisconsin only. Other states set their own rules. | Routine soil fertility samplingUW Extension A2100, Sampling Soils for Testing |
| One composite per 5 acres (2.02 ha) on responsive fields and fields not sampled in the past 4 years. Fewer samples on nonresponsive fields tested within 4 years (Table 1). | W-shaped pattern for a whole field composite. Unaligned grid-point sampling at 200 feet (about 1 acre) or, on nonresponsive fields, 300 feet (2 to 2.5 acres). Zone (smart) sampling. | Plow depth or at least 6 inches (15.24 cm). Chisel or disk: three quarters of tillage depth. Ridge till: 6 inches on ridges, 4 in furrows. No-till: 6 to 7 inches (17.78 cm) for fertilizer advice, plus 2 inches for pH if an acid layer is suspected. | At least 10 cores per composite. 10 to 20 cores give a more representative sample. | Official guidanceUW Extension A2100, Sampling Soils for Testing (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Depth
Cores
Laboratory and analysis
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
United States: federal rules and every other state
Soil sampling regulations in every country
Report an outdated requirement: info@geopard.tech
Set the area per sample, the cores and the depth your rule asks for. GeoPard places the points on a grid or by zone, routes the walk, prints the labels and takes the plan to the field on a phone.
A planning reference built from official sources, not legal advice. Rules apply by jurisdiction, nutrient, land use and programme: check the current official text and your laboratory’s instructions before fieldwork.