Soil sampling requirements in Maine
State rules: Maine Revised Statutes Title 7, Chapter 747 (Nutrient Management Act). State guidance: University of Maine soil sampling instructions and Cooperative Extension advice.
University of Maine soil sampling instructions and Cooperative Extension advice: A uniform 100-acre field needs at least 13 composite samples of no more than 8 acres each, and at least 195 cores in all, 15 per sample.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| MaineUnited StatesMaine only. Other states set their own rules. | Soil tests in a nutrient management planMaine Nutrient Management Act, nutrient management plans (NMP) |
| Not specified | Not specified | Not specified | Not specified | Conditional7 M.R.S. section 4204, Nutrient management plan (Maine Legislature) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Who it applies to
Sources
Sources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| MaineUnited StatesMaine only. Other states set their own rules. | Routine soil fertility samplingUniversity of Maine soil sampling instructions and Cooperative Extension advice |
| Up to 8 acres per sample where past treatment and soil type are uniform. Separate samples for low spots, trouble spots, different soils and differently treated areas. | Uniform sampling areas; keep a permanent field sampling map. | Row crops or new seedings: plow depth, about 8 inches. Sod (hayfields, lawns): 3 to 4 inches. Tree crops: 12 inches. | About 15 spots per sample area | Official guidanceMaine Soil Testing Service, Field and Soil Sample Information form, sampling instructions (PDF) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Depth
Cores
Field identifiers
Sources
Sources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
United States: federal rules and every other state
Soil sampling regulations in every country
Report an outdated requirement: info@geopard.tech
Set the area per sample, the cores and the depth your rule asks for. GeoPard places the points on a grid or by zone, routes the walk, prints the labels and takes the plan to the field on a phone.
A planning reference built from official sources, not legal advice. Rules apply by jurisdiction, nutrient, land use and programme: check the current official text and your laboratory’s instructions before fieldwork.