Soil sampling requirements in Nebraska
State rules: Nebraska Administrative Code, Title 130, Livestock Waste Control Regulations. State guidance: Nebraska Extension sampling advice.
Nebraska Extension sampling advice: A uniform 100-acre field needs at least 3 composite samples of no more than 40 acres each, and at least 30 cores in all, 10 per sample.
| Country / region | Purpose / programme | Time / frequency | Area per sample | Method | Depth | Cores | Status and source |
|---|---|---|---|---|---|---|---|
| United States | |||||||
| NebraskaUnited StatesNebraska only. Other states set their own rules. | Soil phosphorus and nitrogen tests on manure application fieldsLivestock Waste Control Regulations, nutrient management plan |
| Not specified | Soil sampling procedures and depths set out in the nutrient management plan. University of Nebraska guidelines may be used; the Department may approve alternatives. | Not specified | Not specified | ConditionalTitle 130, Livestock Waste Control Regulations (effective 23 September 2026) |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Method
Who it applies to
Laboratory and analysis
In force
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
| NebraskaUnited StatesNebraska only. Other states set their own rules. | Routine soil fertility samplingNebraska Extension sampling advice |
| Fields or areas within fields no larger than 40 acres (16.19 ha) | Random cores within representative areas for a uniform rate. Management zones or a grid with known sample locations for variable rate. | 0 to 8 inches (0 to 20.32 cm) for pH, lime need, organic matter, P, K, S and Zn. Nitrate: subsurface cores to 3 feet (91.44 cm), 2 feet (60.96 cm) at minimum. | 10 to 15 random surface cores per 40-acre area. Six to eight subsoil cores for nitrate. | Official guidanceNebraska Extension, G1740 Guidelines for Soil Sampling |
Who it applies to, the exact wording and every source
The wording in the sourceTiming
Area per sample
Method
Depth
Cores
SourcesSources re-checked every two months, last update October 2026. Reviewed by GeoPard editorial team. | |||||||
United States: federal rules and every other state
Soil sampling regulations in every country
Report an outdated requirement: info@geopard.tech
Set the area per sample, the cores and the depth your rule asks for. GeoPard places the points on a grid or by zone, routes the walk, prints the labels and takes the plan to the field on a phone.
A planning reference built from official sources, not legal advice. Rules apply by jurisdiction, nutrient, land use and programme: check the current official text and your laboratory’s instructions before fieldwork.